Media

Latest News

Successful Installation of two clamps and two I-tubes on FPU ALIMA

August 10, 2022

PETRODIVE is pleased to announce that two clamps and two I-tubes have been successfully installed on FPU Alima for TotalEnergies EP Congo.
 
This specific operation, with a critical lift and load transfer at less than 50 meters from the Riser Balcony between the Field Support Vessel (FSV) and the FPU Alima, was carried out by the FSV teams, PETRODIVE divers, the site, and the I-tubes installer without any notable HSE incident.
 
Thanks to all the ETPS, DLOG, ADW/MB teams, the manufacturer PONTICELLI, our diving team, and the installer SOUTH OFFSHORE. Your combined efforts contributed to the successful completion of this I-tube installation scope.
 
Many thanks also to the support teams of the DAC, AIM/PLANNING and others who also contributed to this success.
 

Stay up to date with our newsletter